Event Details

Back to Events
Event/Class:
Pull/Kanban Systems
Date/Time:
October 13, 2009 - 8:00 - 4:30
Registration Close Date:
10/10/09
Registration Closed
Workshop Request
Description:

Achieving shop floor control of inventory and production scheduling without the aid of MRP is the hallmark of pull signals.  When used correctly, pull signals can bring order from chaos by linking producing and consuming processes while often reducing WIP by 50%.  This workshop teaches how to design and implement a visual customer-driven pull material replenishment system.  You will learn how to implement repetitive pull systems, set up point-of-use storage, interface with planning systems, and set lot sizes with capacity, not economic order quantity theory.

If you are interested in paying by credit card, please finish the registration process and then point your browser to www.paypal.com. Please remit your payment to paypal@mantec.org.

 

Location:MANTEC Office- JEM Room 227 West Market Street York, PA 17401
Fee:$275. Additional people: $275
Contact:Dave Freimuth
717-645-3580
freimuth@mantec.org

MANTEC Blog

A Blog Post About Lean Manufacturing

Sept 30, 2008 | Posted By: John Doe | Category: Lean Manufacturing

Ses stulta libroj promenos rapide. Nau arboj skribas kvar auxtoj. Kvin stratoj igxis kvar cxambroj. Ses kalkuliloj havas du bildoj, sed kvar rapida birdoj acxetis nau domoj. Kvar kalkuliloj parolis. Ses arboj trinkis nau bieroj. Kwarko varme havas kvin bona vojoj, kaj multaj hundoj batos Londono, sed kvin radioj tre stulte havas kvar vere.

Continue Reading | Comments (5)

Select a Page