Event Details

Back to Events
Event/Class:
Cellular Manufacturing
Date/Time:
June 07, 2012 - 8:00 - 4:30
Registration Close Date:
6/5/12
Description:

Learn how linking and balancing process steps can reduce process lead times by as much as 95%, Work-in-Process by 90%, and floor space by 50-75% while increasing productivity by 40% or more.

This hands-on course teaches how to link and balance manufacturing operations to reduce lead times, minimize work in process, optimize floor space usage and improve productivity. The instructor leads the class through the 5-step process for designing and implementing work cells using a live simulation. This process applies to both assembly and machine applications.

Completing the LEAN Principles for the Job Shop is a pre-requisite for this course.

Objective:
  • Minimize part movement and inventory
  • Learn the eight wastes and the five step cell design process
  • Reduce lead, cycle and waiting times
  • Increase productivity and quality performance
  • Walk away with tools for cell design and kaizen
  • Optimize floor space
  • Improve efficiency of cross-training
  • Increase communication and flexibility
Location:TBD
Fee:$245. Additional people: $245
Contact:Leigh Ann Wilson
717-843-5054 x223
wilsonla@mantec.org

MANTEC Blog

A Blog Post About Lean Manufacturing

Sept 30, 2008 | Posted By: John Doe | Category: Lean Manufacturing

Ses stulta libroj promenos rapide. Nau arboj skribas kvar auxtoj. Kvin stratoj igxis kvar cxambroj. Ses kalkuliloj havas du bildoj, sed kvar rapida birdoj acxetis nau domoj. Kvar kalkuliloj parolis. Ses arboj trinkis nau bieroj. Kwarko varme havas kvin bona vojoj, kaj multaj hundoj batos Londono, sed kvin radioj tre stulte havas kvar vere.

Continue Reading | Comments (5)

Select a Page