Event Details

Back to Events
Event/Class:
Cellular Manufacturing
Date/Time:
January 07, 2010 - 8:00 - 4:30
Registration Close Date:
12/23/09
Registration Closed
Workshop Request
Description:

Learn how linking and balancing process steps can reduce process lead times by as much as 95%, Work-in-Process by 90%, and floor space by 50-75% while increasing productivity by 40% or more.

This hands-on course teaches how to link and balance manufacturing operations to reduce lead times, minimize work in process, optimize floor space usage and improve productivity. The instructor leads the class through the 5-step process for designing and implementing work cells using a live simulation. This process applies to both assembly and machine applications.

Completing the LEAN Principles for the Job Shop is a pre-requisite for this course.

If you are interested in paying by credit card, please finish the registration process and then point your browser to www.paypal.com. Please remit your payment to paypal@mantec.org.

 

 

Location:TBD- Based on registrant location
Fee:$245. Additional people: $245
Contact:Mark Robertson
717-676-6227
robertsonms@mantec.org

MANTEC Blog

A Blog Post About Lean Manufacturing

Sept 30, 2008 | Posted By: John Doe | Category: Lean Manufacturing

Ses stulta libroj promenos rapide. Nau arboj skribas kvar auxtoj. Kvin stratoj igxis kvar cxambroj. Ses kalkuliloj havas du bildoj, sed kvar rapida birdoj acxetis nau domoj. Kvar kalkuliloj parolis. Ses arboj trinkis nau bieroj. Kwarko varme havas kvin bona vojoj, kaj multaj hundoj batos Londono, sed kvin radioj tre stulte havas kvar vere.

Continue Reading | Comments (5)

Select a Page